搜索资源列表
psb2machines_pss
- 一1000 MW水电站(机组M1)通过一条500 kV, 700 km的输电线路与负载中心连接。负载中心模型是5000 MW的阻抗负载,由遥远的1000 MW电站和当地的5000 MW (机组 M2)电站供电。系统已经初始化,因此线路传送950 MW,接近它的潮流阻抗负载(SIL = 977 MW)。这两台机相当于一台水轮机和管理(HTG),励磁系统和电力系统稳定器(PSS)。这三个模块位于“涡轮和调速”子系统中。通过此例,在500 kV系统中制造故障,观察PSS对系统稳定性的影响。-a 1,0
c
- 电力系统短路故障计算 ,应用于电力系统分析。-Power system fault calculation
guzhangjisuan
- 本程序是实现电力系统的故障计算程序,故障后会对导纳矩阵进行修正,很好的进行了仿真-This program is a power system fault calculation program, fault admittance matrix will be revised, a good simulation
buduichengguzhang
- 电力系统不对称电路的故障分析及计算,包括单相短路故障,两相短路故障等-Asymmetry of power system fault analysis and calculation of the circuit, including single-phase short circuit fault, such as two-phase short circuit fault
xiaobomojidazhi
- 可以提取信号的突变量,用于电力系统故障测距方面-Mutations in the signal can be extracted amount of respect for the power system fault location
prony
- 基于prony算法的电力系统故障信号快速拟合-Algorithm based on prony quick fitting power system fault signals
fft_dieout_p
- 这是一个电力系统故障诊断的一个仿真程序,里边有比较详细的说明-This is a power system fault diagnosis of a simulation program, a more detailed descr iption inside
matpower3.0b3
- matpower作电力系统潮流分析,故障计算,市场交易、运行调度等-power ananlysis
pmallfunctiooo
- 电力系统故障计算,能计算单相短路,单相接接地短路,三相短路,两相短路接地,两相短路 -power system fault, can calculate the single-phase short ccircuit, short-circuit to the single--phase and three-phase short-circuit, two-phase short-circuit grounding, two phase short circuit
PReaad_COMTRRr
- 电力系统专业往往要涉及到故障数据处理,也就是解析COMTRADE格式的的数据文件.此代码完成读取COMTRADE格式文件的功能(matlab中) -Professionals often have to power system fault data relating to treatment, that is, analyticc COMTRADE format data files. This code completion read COMTRADE format files (mat
sanjixitong
- 电力系统3机系统的暂态稳定仿真程序,子程序为故障前故障中和故障后三个状态-System for power system transient stability simulation program, subroutine, three failures before the failure and fault status
LP_test14node
- 电力系统连锁故障分析中的内点法最优潮流模型-Chain failure analysis of power system optimal power flow model of the interior point method
three-phase-fault
- 电力系统三相故障,节点导纳矩阵和残压矩阵的matlab计算-Matlab calculation of the power system three-phase fault, the node admittance matrix and the residual voltage matrix
lx1
- 电力系统故障仿真计算源码和模型,可以用来仿真电网的单相、两相和三相故障-Source and model of power system fault simulation can be used to the simulation grid single-phase, two-phase and three-phase fault
zataifenxi
- 电力系统暂态分析程序,可以设定故障发生和切除时间,画出发电机的摇摆曲线-Power system transient analysis program, you can set the time of failure and excision, draw the rocking curve of the generator
zantaifenxi
- 基于Matlab/simulink电力系统暂态稳定性分析仿真模型-不同切除时间对两相接地故障的影响-Matlab / simulink power system transient stability analysis of the simulation model
simulink电力系统仿真
- simulink电力系统仿真实例,含故障波形。(Simulink power system simulation example, including fault waveform.)
matpower4.0b2
- 本书共9章,第1章为MATLAB基础知识;第2章为Simulink仿真入门;第3章为电力系统元件模型及模型库介绍;第4章为MATLAB在电力系统潮流计算中的应用实例;第5章为MATLAB在电力系统故障分析中的仿真实例;第6章为MATLAB在电力系统稳定性分析中的应用实例;第7章为MATLAB在微机继电保护中的应用实例;第8章为MATLAB在高压直流输电及柔性输电中的仿真实例;第9章为MATLAB在风力发电技术中的应用仿真。(There are 9 chapters in this book, a
Applications_of_ComplexNeworks_PowerGrids
- 以下两篇应用复杂网络解决电力系统问题文章的源代码 1.Applications of Complex Network Analysis in Electric Power Systems 2.Optimal Microgrids Placement in Electric Distribution Systems Using Complex Network Framework(Applications of Complex Neworks in Power Grids Code used for
电力系统暂态稳定分析程序1
- 本程序是暂态稳定分析程序,3机9节点模型,对其在pt时刻7号节点发生三相短路故障,并在ct时刻将故障切除进行仿真,最后绘出2号和1号发电机的功角差与时间的关系曲线。发电机模型采用三阶模型,忽略阻尼,电枢电阻取为零;励磁系统仅有量测和放大环节,忽略反馈和电压调节器;负荷采用恒定阻抗负荷。(This program is a transient stability analysis program, three machine nine node model, which has three-pha