搜索资源列表
DL698-08.021
- 低压集抄698国电技术条件08版送审稿:含厂站、公变、专变采集终端特殊要求及上下行规约-Set low power technology to copy the conditions of 698 countriesversion 08: Plant with the public variable, the variable collection terminal and the special requirements of the Statute of the whole trip
soft_design_for_hydro-power_plat
- 详细介绍了集控系统软件的实施方案及实施思路,具有较为重要的参考意义-soft design for hydro-power plant central control system
Lecture6-IS-Design(ProjectManagementTools)
- Also known as Critical Network Analysis Developed by Dupont and Remington Rand in the late 1950s for managing plant maintenance projects Uses one duration estimate for each activity Provides basic framework for project planning and
CTRL-225
- The aim of this research is to design a PID Controller using PSO algorithm. The model of a DC motor is used as a plant in this paper
network-resource-management-system
- 随着网络的不断扩增,我厂网络的规模也随之日益庞大复杂,这就需要有一个好的网络资源管理系统,它是确保网络正常运作的保障。本文提出了一种可视化的网络资源管理的实施方案,既可以用于正常时期的网络设备管理,一旦发生网络故障,更可以尽快帮助查错排错,有效地将故障影响降至最低。用VisualNet来进行大型复杂的网络综合管理,是目前逐渐受到重视的一个选择-I plant the size of the network as the network' s ever-expanding increasin
re
- this thermal power plant report-this is thermal power plant report
Def-Sta-23-Series
- Def Stan 23-6-Technology Guidance for Military Logistics Vehicles Def Stan 23-7-Design Guidlines for Armoured Fighting Vehicles Def Stan 23-8-Winterization - Military Logistic Vehicles, Towed Equipment and Mechnanical Handling Equipment Def Sta
zishiying
- 本文的研究工作以重庆市某活性污泥污水处理厂为背景展开。活性污泥污水 处理法是世界各国普遍采用的一种污水处理的生物方法,它的原理是利用污泥中 微生物的生命活动来清除污水中的污染物质。-The research work in this paper taking Chongqing city of a sewage treatment plant as the background. Activated sludge wastewater Processing method is
Into-the-black-hat-seo
- 黑帽seo一个很重要的作用就是建立企业品牌和企业知名度。大多数时候,黑帽seohttp://www.heimaoxuexi.com的操作并不是让网站本身的名称有一个好的排名,而是使网站的关键词具有良好的排名表现。例如我们需要对天津某轴承生产厂家进行搜索引擎优化,我们并不是将该厂的厂名“天津某某轴承厂”作为关键词,而是将“轴承”以及所有相关的长尾词作为优化对象。一旦大多数关于“轴承”的词汇进入各大搜索引擎的搜索结果前列,那么很快,该厂的名称也被经销商和代理商所记住。 -Black hat seo
300MWplant-simulink
- 300MW火电机组仿真运行条例,很全,想对电厂仿真运行流程有所了解以及写实习报告的童鞋,千万不要错过-300MW Thermal Power Plant Simulation runs regulations, it is full, want to understand the process plant simulation run and write internship report shoes, do not miss
grid-wind-power-plant
- 电网不平衡状态下风电机组运行控制中电压同步信号的检测-Between grid wind power plant and the control voltage synchronous signal detection
Plant
- Grey Controller with matlab
yashuiduihedianchang
- 压水堆核电厂工艺,自己做的课程设计,基本功能实现-Pressurized water reactor nuclear power plant technology
Huaneng-Power-
- 华能东方电厂1号机励磁系统建模试验报告,通过对励磁调节器各环节测试,进行仿真实验,并经过模型校核。-Huaneng Power Plant No.1 Oriental Excitation System Modeling experiments reported by all sectors of the field regulator testing, simulation experiment, and after checking the model.
Power-Substation
- 本文主要是介绍电厂变电站的高可靠性接线方式,学习电力的朋友比较合适-This paper is to introduce high-reliability substation power plant wiring, learning power of friends more appropriate
power-plant-electrical
- 本文主要是分析山西阳城电厂电气主接线,对于学电力的朋友来说,并有用 的-This paper is to analyze the Shanxi Yangcheng power plant electrical main wiring, for the school power of friends, and useful
mtc_part_1_overview_v1.3
- MTConnect是美国AMT的关于工厂信息集成的工业标准。这是v1.3版本标准文档的第一部分-MTConnect American AMT integrated plant information regarding industry standards. This is the first part of the standard document of v1.3.
MTC_Part_2_ComponentsPP1.3.1PFinal
- MTConnect是美国AMT的关于工厂信息集成的工业标准。这是v1.3标准文档的第二部分-MTConnect American AMT integrated plant information regarding industry standards. This is the second part of the standard document of v1.3.
MTC_Part_3_Streams_1P3P1_FINAL
- MTConnect是美国AMT的关于工厂信息集成的工业标准。这是v1.3标准文档的第三部分-MTConnect American AMT integrated plant information regarding industry standards. This is the third part of the standard document of v1.3.
mtc_part_3.1_interfaces_v1.3
- MTConnect是美国AMT的关于工厂信息集成的工业标准。这是v1.3标准文档的第三部分的第二部分-MTConnect American AMT integrated plant information regarding industry standards. This is the second part of the third part of the standard document of v1.3.